- Quick navigation
- Home
- Open menu
- Page content
- Customer service
- Search
- Footer
Solar energy in Quartino
Green Solar Energy Sagl
Green Solar Energy Sagl
Solar energy in Quartino
Gallery (4)
- Monday8:00 to 12:00 / 13:00 to 17:00
- Tuesday8:00 to 12:00 / 13:00 to 17:00
- Wednesday8:00 to 12:00 / 13:00 to 17:00
- Thursday8:00 to 12:00 / 13:00 to 17:00
- Friday8:00 to 12:00 / 13:00 to 17:00
- SaturdayClosed
- SundayClosed
By appointment
- Monday8:00 to 12:00 / 13:00 to 17:00
- Tuesday8:00 to 12:00 / 13:00 to 17:00
- Wednesday8:00 to 12:00 / 13:00 to 17:00
- Thursday8:00 to 12:00 / 13:00 to 17:00
- Friday8:00 to 12:00 / 13:00 to 17:00
- SaturdayClosed
- SundayClosed
By appointment
- Monday
Green Solar Energy Sagl – Contacts & Location
Description
GREEN SOLAR ENERGY
The staff of 's company Green Solar Energy is at your disposal to design and develop a project of a high quality turnkey Photovoltaic system that reflects all technical and architectural requirements.
The Photovoltaic modules such as Inverters and all components used are of the highest quality and manufactured in Germany and Austria.
Green Solar Energy's installation teams perform the installation in an accurate clean and professional manner .
Design
After a careful inspection and surveying of the roof measurements our designers develop and compare different installation possibilities defining the best design.
Documentations for entities
After the project is defined our staff draws up all the documentation to be forwarded to the various entities such as, City Hall, Electricity Company, Canton and Swiss Grid.
All plans for 'installation and electrical connections will also be set up to be handed over to our assembly team.
Installation Work Start
The planners will carry out on site careful instruction to the assembly team who will begin the actual assembly.
Safety installation
Installation of the protection lines during the 'installation of' imianto in accordance with SUVA directives.
Transportation and site installation
Transportation of photovoltaic modules and all the material that makes up the 'system, laying elevator necessary to bring the material on the roof.
Assembly
Laying and assembling the support structure of the PV modules, laying the modules and wiring the connection lines.
Electrical connection
Laying down lines of the PV cables to the 'inverter and wiring of the electrical panel including protective fuses, DC and AC arresters and circuit breakers.
Inverter connection to the electrical panel of the power company
Connection of the AC line to the meter panel of the power company.
Checking and commissioning
General inspection of the installation, checking the operation of the system and connecting lines, performing DC and Rasi testing.
Site cleaning
Dismantling of elevator and lifelines at the end of the work, site cleaning and amalgamation of remaining materials in landfill.
Instruction to the client and delivery of documentation.
Instruction to the client on the operation of the installation and delivery of technical documentation in hard copy PDF format.
Storage Batteries for Photovoltaic Systems
- Italian
- By telephone,Online
- Categories
- Solar energyPhotovoltaics Solar panelSolar technology, solar systemsAlternative energyHeating systems